Specification
• Free-standing tank
• PUR foam insulation
• Ensures high efficiency of the heating system, especially for installations with more than one
heat source.
• Eliminates the risk of wasting energy and ensures great convenience of using the heating system.
• The presence of buffer tanks makes the entire heating system work much more efficiently and effectively.
More inforamtion see tech sheet
Parameters
ZBG 200 | ZBG 300 | |
Energy efficiency class |
B |
B |
Capacity |
205 l |
298 l |
Work pressure |
3 bar (o,3 MPa) |
3 bar (o,3 MPa) |
Work temperature |
95oC |
95oC |